Project: Rehau Project

Rehau Project

Job Overview

This job incorporated several techniques that Russo performs.

1. The Approach

Russo Designed and Engineered a Retaining Wall inside a building so that this company could add on a paint booth. This pit was 14.5′ at its deepest point.

2. The Solution

Russo came in and drilled Secant Piles and H-Piles. Then we began Excavation on the pit. We then began to install Soil Nails and Tiebacks. We then hung wire mesh and put the initial shotcrete layer on the wall’s face. Russo then ran rebar reinforcing on the wall and shot a final layer of Shotcrete.